Skip to main content
Construction & HomeInstant resultsImperial & metricFree to use

Concrete Calculator

Estimate concrete volume for slabs, patios, footings, and columns. Calculate cubic yards, cubic meters, concrete bags, and material costs with accurate formulas.

How much concrete do I need for my project?

Measure your forms, choose any allowance, then review volume, bags and material cost.

Geometric volume: 1.48 yd³

View results ↓

Project measurements

LengthWidthThickness
Dimension guide · illustrative, not to scale

40 ft³ · 1.4815 yd³

Additional concrete allowance

Optional extra material; the physical dimensions stay the same.

Choose an allowance for your conditions. No percentage guarantees sufficient concrete.

Concrete bags

Use finished mixed yield, rather than bag weight, to calculate bags.

Preset yield is approximate and specific to QUIKRETE Concrete Mix 1101. Other mixes can differ. Manufacturer yield source

Material cost (optional)

Finished concrete weight (optional)

Geometric volume 1.4815 cubic yards. Purchase estimate 1.4815 cubic yards. 67 bags.

Concrete required · geometric volume

1.48yd³

Volume from the entered dimensions, before any additional allowance.

Cubic feet
40 ft³
Cubic yards
1.481481 yd³
Cubic meters
1.132674 m³
Slab area (all identical objects)
120 ft²
Additional allowance
0% · 0 ft³
Estimated purchase volume
40 ft³
Purchase · cubic yards
1.481481 yd³
Purchase · cubic meters
1.132674 m³

Formula

40 ft³ × (1 + 0 / 100) = 40 ft³ to purchase

  • Displayed values are rounded. Calculations and exports retain the underlying numerical precision.

Bags required

67 bags

Ceiling(40 ft³ ÷ 0.6 ft³ per bag). Allowance included once.

80 lb QUIKRETE Concrete Mix 1101 (approximate manufacturer yield)

Bagged supply volume
40.2 ft³
Surplus from whole bags
0.2 ft³
Dry premix mass
2,431.2551 kg

Calculation breakdown

Show Calculation Steps
  1. Patio slab

    Length × width × thickness/depth/height × quantity

    12 × 10 × 0.3333333333333333 × 1 = 40 ft³

    All dimensions in this calculation are in feet; quantity is 1.

  2. Add section volumes: 40 = 40 ft³.
  3. Convert geometric volume: 40 ÷ 27 = 1.48148148 yd³; × 0.028316846592 = 1.13267386 m³.
  4. Apply allowance once: 40 × (1 + 0 / 100) = 40 ft³.
  5. Round up purchase volume ÷ finished yield per bag: ceiling(40 / 0.6) = 67 bags.

Quantity estimate only. These dimensions do not establish structural thickness, load capacity, footing adequacy, strength, reinforcement, soil suitability or code compliance. Structural construction decisions need appropriate professional guidance.

On this page

What Is a Concrete Calculator?

A concrete calculator turns form measurements into a volume estimate for a slab, patio, driveway, wall, footing or column. It expresses the same volume in cubic feet, cubic yards and cubic meters, then helps estimate an order using optional allowance, bag yield and pricing.

Concrete is the complete material containing cement and aggregate; cement alone is not interchangeable with premixed concrete. This concrete mix calculator estimates finished volume. It does not design cement, sand, aggregate or water proportions.

How to Calculate Concrete Volume

Convert measurements to compatible units before multiplying. Rectangular volume is length × width × depth. The wall and rectangular-column modes use that same geometry with labels suited to the project.

For a cylinder, volume = π × (diameter/2)² × height. A circular slab uses its thickness in place of height. A hollow tube subtracts the inner cylinder from the outer one: π × (outer radius² − inner radius²) × height. Multiply any single-object result by its quantity.

All displayed formulas use your actual measurements converted to feet. Expand Show Calculation Steps to inspect each section, the combined volume, conversions, allowance, bags and cost.

How Much Concrete Do I Need?

  1. Choose the project shape and measure the actual form or space to be filled.
  2. Select a unit for each dimension. Feet, inches, feet plus inches, yards, meters, centimeters and millimeters are supported. Changing a unit preserves its physical measurement.
  3. Set the number of identical objects. Use Multiple Areas for sections with different dimensions or shapes, and give each a useful name.
  4. Check the geometric total, then enter any optional additional allowance.
  5. Use a product’s finished bag yield or a ready-mix quote to estimate the purchase.

For an irregular footprint, calculate its area with the Square Footage Calculator and choose Known area × thickness here. Do not count overlapping slabs or shared footing intersections twice.

How to Calculate Concrete for a Slab

Consider a slab 12 feet long, 10 feet wide and 4 inches thick. Convert thickness first: 4 ÷ 12 = ⅓ foot. Then multiply:

12 × 10 × (4/12) = 40 ft³.

The footprint is 120 ft². Dividing volume by 27 gives approximately 1.48148 yd³, while multiplying by 0.028316846592 gives approximately 1.13267 m³. The main result rounds to 1.48 yd³; ordering calculations retain the underlying value.

These dimensions illustrate the formula. They are not a specification for slab thickness, reinforcement or load capacity.

How to Calculate Concrete in Cubic Yards

Cubic yards = cubic feet ÷ 27. One cubic foot equals exactly 0.028316846592 cubic meters; one cubic meter is approximately 35.3146667 cubic feet. These factors convert volume, unlike an area conversion.

With metric inputs, length × width × depth in meters directly gives cubic meters. One inch is exactly 2.54 centimeters, and one foot is exactly 0.3048 meters. Each dimension selector handles those conversions independently, so a length in feet and a thickness in millimeters are compatible.

How Many Bags of Concrete Do I Need?

Use bags = ceiling(purchase volume ÷ finished yield per bag). “Ceiling” means round upward to a whole bag. Keep yield and purchase volume in compatible units. This calculator accepts cubic feet, cubic meters or liters for custom yield.

For the 40 ft³ slab with a chosen 10% allowance, purchase volume is 44 ft³. At an approximate 0.60 ft³ per bag, 44 ÷ 0.60 = 73.333… and the estimate is 74 bags. Their nominal combined yield is 44.4 ft³; the extra 0.4 ft³ comes from rounding to whole bags, not a second allowance.

Bag weight can be recorded in pounds or kilograms to estimate dry premix mass. It does not determine yield. Finished concrete density is a separate optional calculation and is never substituted for a manufacturer’s bag yield.

Concrete for a 4-Inch Slab

A chosen 4-inch thickness uses ⅓ ft³ of concrete per square foot. For a 10 × 10 ft example, 100 × ⅓ = 33⅓ ft³, approximately 1.23457 yd³. At a 0.60 ft³ bag yield and no allowance, round 55.555… up to 56 bags.

The required structural thickness depends on the intended use and site conditions. Enter the specification for your project rather than treating this example as design advice.

Concrete for a 6-Inch Slab

At 6 inches, thickness is 0.5 feet. The same 100 ft² footprint needs 50 ft³, approximately 1.85185 yd³, before allowance. At 0.60 ft³ per bag, that is 84 whole bags.

Increasing thickness from 4 to 6 inches increases volume by 50% when area is unchanged. A small thickness measurement error can materially change the order, so measure actual forms and varying depths carefully.

How to Calculate Concrete for Footings

A rectangular footing uses length × width × depth × quantity. A circular footing uses π × radius² × depth × quantity.

For four circular footings with example diameter 12 inches and depth 24 inches, convert radius to 0.5 ft and depth to 2 ft. Total volume is 4 × π × 0.5² × 2 ≈ 6.28319 ft³. Calculate different footing sizes as separate sections.

These are quantity estimates only. Soil, loads, frost conditions, building codes and professional requirements determine structural footing dimensions.

How to Calculate Concrete for Columns

A circular column 12 inches in diameter and 8 feet high contains π × 0.5² × 8 ≈ 6.28319 ft³. A rectangular column uses its two cross-sectional dimensions multiplied by height. Multiply by quantity for identical columns.

For a concrete tube, enter outer and inner diameters and the height. The inner diameter must be smaller. In Post hole mode, optionally subtract a round or square embedded post; square posts use their actual square cross-section and must fit across their diagonal inside the hole. Embedded depth may be less than hole depth when there is concrete beneath the post.

Concrete Bag Yield Chart

These approximate example yields are specific to QUIKRETE Concrete Mix, Product No. 1101. They do not describe every concrete brand or mix. Use the yield stated on your bag label if it differs.

QUIKRETE 1101 illustrative finished yields; no additional allowance
Dry bag weightYield (ft³)Bags per yd³
40 lb0.3090
50 lb0.37572
60 lb0.4560
80 lb0.6045

Yield estimates describe finished mixed volume. The source also lists an approximate unit weight of 140 lb/ft³, used only as an editable starting assumption for finished weight.

How to Estimate Concrete Cost

For bagged concrete, multiply rounded-up bags by price per bag. An illustrative 74 bags at $6 each costs $444 before delivery and other charges. For ready-mix, an illustrative 2 yd³ at $150/yd³ costs $300. These prices demonstrate arithmetic and are not current supplier quotes.

Enter your quote, optional delivery charge and additional charges. The total adds those costs once. USD, PKR, GBP and EUR formatting is supported; changing currency does not convert a price or retrieve an exchange rate. Costs exclude labor, reinforcement and any fees or taxes you have not entered.

Ready-Mix vs Bagged Concrete

Ready-mix quotes commonly use a volume unit such as a cubic yard or cubic meter. Premixed bags use a whole bag count and product-specific yield. Both purchasing methods start from the same geometric volume and chosen allowance.

Supplier minimum loads, delivery access, waiting charges, batching increments and mixing or placement logistics can affect a real order. This tool does not apply supplier minimums or round ready-mix to a supplier’s order increment. Confirm those terms directly.

Why Concrete Waste Allowances Matter

Uneven forms, excavation differences and placement losses can cause actual consumption to differ from ideal geometry. An optional allowance increases the estimated purchase quantity while leaving the physical slab or footing volume unchanged.

Purchase volume = geometric volume × (1 + allowance%/100). At 10%, 40 ft³ becomes a 44 ft³ purchase estimate. Multiple Areas applies that percentage once to the combined total, before calculating bags or ready-mix cost. No preset percentage guarantees sufficient material.

Frequently Asked Questions

How much concrete do I need?

Measure each form, calculate its volume and multiply by the number of identical objects. Add non-overlapping sections, then apply any chosen purchase allowance once. Use the supplier’s units when ordering.

How do I calculate concrete in cubic yards?

First convert dimensions to feet. Multiply length × width × depth for a rectangular shape, then divide cubic feet by 27. A 12 × 10 ft slab at 4 inches thick is 40 ft³, approximately 1.48148 yd³.

How much concrete is needed for a 10×10 slab?

Thickness is needed as well as area. At an example thickness of 4 inches, a 10 × 10 ft slab contains 33⅓ ft³, approximately 1.23457 yd³. At 6 inches it contains 50 ft³, approximately 1.85185 yd³, before allowance.

How many cubic feet are in one cubic yard?

Exactly 27: a yard is 3 feet, so a cubic yard is 3 × 3 × 3 cubic feet. Dividing cubic feet by 3 would give the wrong result.

How many bags of concrete make one cubic yard?

Divide 27 ft³ by the finished yield per bag and round up. With the approximate QUIKRETE 1101 yields below, one cubic yard takes 90 forty-pound, 72 fifty-pound, 60 sixty-pound or 45 eighty-pound bags, before an allowance. Different products can yield different volumes.

How many bags are needed for a 4-inch slab?

Multiply area in square feet by 4/12 to get cubic feet. Apply any allowance, divide by your product’s yield and round up. A 12 × 10 ft example with 10% allowance needs 44 ft³; at 0.60 ft³ per bag, that is 74 bags.

How do I calculate footing concrete?

For a rectangular footing use length × width × depth. For a circular footing use π × (diameter/2)² × depth. Multiply by quantity. These formulas estimate material and do not establish an adequate structural footing size.

How much does concrete cost?

Use a supplier quote. Multiply purchase cubic yards or cubic meters by the quoted unit price, or multiply the rounded bag count by price per bag. Add delivery and any entered charges. The calculator has no live supplier pricing.

Can I use square feet to estimate concrete volume?

Yes, if you also know thickness. Known area × thickness accepts square feet, square meters or square yards. Area alone cannot determine cubic yards because it contains no depth information.

Does every 80 lb concrete bag produce the same volume?

No. Dry weight is not a universal finished-volume specification. The 0.60 ft³ example belongs to QUIKRETE Concrete Mix 1101. Use the actual finished yield stated by the manufacturer of your mix.

Can I subtract a fence post from a post hole?

Yes. Select round or square post, enter its actual diameter or side and its embedded depth. A square post uses side² × embedded depth; a round post uses π × radius² × embedded depth. Only the part within the hole is subtracted.

Calculation Method & Limitations

Dimensions are stored internally in feet without display rounding. Calculations use JavaScript double-precision numbers and π for circular shapes. Conversion factors follow exact international length definitions; decimals shown in results are rounded for readability. Bag counts round upward after allowing for machine-scale numerical noise at an integer boundary.

The calculator accepts up to 12 sections, whole quantities from 1 to 1,000,000 and allowances from 0% to 100%. Nonpositive dimensions, invalid yields and nonfinite or excessively large intermediate values are rejected. Custom prices and densities must be finite and valid. Calculations run locally without a supplier service.

Copy, print and CSV include each section’s converted dimensions, formula, quantity and volume plus the purchase assumptions. Finished concrete weight uses geometric volume and the entered density; dry premix mass uses bag count and dry package weight. They describe different materials and stages.

Quantity estimation does not certify structural thickness, load capacity, concrete strength, reinforcement, soil suitability or building-code compliance. Seek the professional guidance appropriate to the construction decision.

Reference: QUIKRETE 1101 technical data: finished bag yields and approximate unit weight; QUIKRETE project calculators and yield guidance.